{"id":1516,"date":"2026-06-18T19:02:20","date_gmt":"2026-06-18T19:02:20","guid":{"rendered":"https:\/\/www.lebihan.de\/industry-energy\/"},"modified":"2026-10-20T10:33:13","modified_gmt":"2026-10-20T10:33:13","slug":"industry-energy","status":"publish","type":"page","link":"https:\/\/www.lebihan.de\/en\/industry-energy\/","title":{"rendered":"Industry &#8211; Energy"},"content":{"rendered":"<div class=\"lbx\"><section class=\"hero bg-mode\">\n    <div class=\"hero-bg\"><img width=\"2560\" height=\"1707\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-mr-dr3igeteilt-2159455987-36137497.jpg\" class=\"attachment-full size-full\" alt=\"Energy &amp; Utilities\" loading=\"eager\" fetchpriority=\"high\" decoding=\"async\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-mr-dr3igeteilt-2159455987-36137497.jpg 2560w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-mr-dr3igeteilt-2159455987-36137497-300x200.jpg 300w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-mr-dr3igeteilt-2159455987-36137497-1024x683.jpg 1024w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-mr-dr3igeteilt-2159455987-36137497-768x512.jpg 768w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-mr-dr3igeteilt-2159455987-36137497-1536x1024.jpg 1536w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-mr-dr3igeteilt-2159455987-36137497-2048x1366.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/div>  <div class=\"wrap\">\n    <div class=\"hero-grid\">\n      <div class=\"hero-copy\">\n        <span class=\"eyebrow has-icon\"><svg class=\"ic\" viewBox=\"0 0 24 24\" aria-hidden=\"true\"><path d=\"M13 3l-7 10h5l-1 8 7-10h-5z\"\/><\/svg>Energy &amp; Utilities<\/span>\n        <h1>Manage expansion, investments, and supply security simultaneously.<\/h1>\n        <p class=\"lede\">Grids, generation, storage, and new energy infrastructures are being expanded in parallel, while existing systems must continue to operate. High investment needs meet limited approval, engineering, and implementation capacities. <\/p>\n        <div class=\"hero-actions\">\n          <a class=\"btn btn-primary\" href=\"#kontakt\">Schedule an initial consultation \u2192<\/a>\n          <a class=\"branch-text-link\" href=\"#beitrag\">How we support you \u2192<\/a>        <\/div>\n      <\/div>\n          <\/div>\n  <\/div>\n<\/section><\/div>\n<div class=\"lbx\"><section class=\"section\" id=\"ausgangslage\"><div class=\"wrap\">\n  <div class=\"sec-head left reveal\"><span class=\"eyebrow\">The Starting Point<\/span><h2>When expansion goals meet real implementation capacity.<\/h2><p>The transformation of the energy system is increasingly an implementation task. Grids must be expanded and digitized, new generation and storage facilities integrated, and existing infrastructure operated and renewed in parallel. Heat, hydrogen, electromobility, and increasing connection demands raise the number of interdependent projects. This not only increases investment volume. Approvals, engineering, construction capacity, and specialized supply chains increasingly determine how much of the planned portfolio can actually be implemented.    <\/p><\/div>\n  <aside class=\"branch-context-note reveal\"><span>Industry Situation \u00b7 2026<\/span><p>The BDEW estimates the investment required for the energy transition by 2030 at around 721 billion euros. Approximately 49% is allocated to generation, with another 41% to electricity, gas, and hydrogen grids. <a href=\"https:\/\/www.bdew.de\/media\/documents\/Fortschrittsmonitor_2024.pdf\" target=\"_blank\" rel=\"noopener noreferrer\">BDEW \u00b7 Progress Monitor 2024 \u2197<\/a><\/p><\/aside>  <div class=\"drivers-label reveal\">What drives the industry<\/div>\n  <div class=\"drivers\">\n        <article class=\"driver-card reveal\">\n              <div class=\"driver-img\"><img decoding=\"async\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-bence-szemerey-337043-6804259-1.jpg\" alt=\"Expansion becomes an industrial implementation task.\" loading=\"lazy\"><\/div>\n            <div class=\"driver-body\">\n        <span class=\"driver-kicker\">Grids &amp; Infrastructure<\/span>\n        <h4>Expansion becomes an industrial implementation task.<\/h4>\n        <p>New generation, storage, heat pumps, charging infrastructure, and increasing electricity demand raise the requirements for transmission and distribution grids. Project pipelines and interdependencies grow accordingly. <\/p>\n        <div class=\"driver-q\"><span>The question behind it:<\/span> How much expansion can actually be realized with existing approval, supplier, and implementation capacities?<\/div>      <\/div>\n    <\/article>\n        <article class=\"driver-card reveal\">\n              <div class=\"driver-img\"><img decoding=\"async\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/pexels-wolfgang-weiser-467045605-35219186.jpg\" alt=\"Capital requirements and prioritization pressure are rising in parallel.\" loading=\"lazy\"><\/div>\n            <div class=\"driver-body\">\n        <span class=\"driver-kicker\">Investments &amp; Regulation<\/span>\n        <h4>Capital requirements and prioritization pressure are rising in parallel.<\/h4>\n        <p>Grids, generation, transformation, and existing assets compete for investment funds. Some measures are regulatory or technically mandatory, while others follow growth or transformation goals. <\/p>\n        <div class=\"driver-q\"><span>The question behind it:<\/span> Which investments must be implemented when \u2013 and which projects can be postponed under changed conditions?<\/div>      <\/div>\n    <\/article>\n        <article class=\"driver-card reveal\">\n              <div class=\"driver-img\"><img decoding=\"async\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-mr-dr3igeteilt-2159455987-36137497.jpg\" alt=\"Critical infrastructure is being rebuilt during ongoing operations.\" loading=\"lazy\"><\/div>\n            <div class=\"driver-body\">\n        <span class=\"driver-kicker\">Operations &amp; Transformation<\/span>\n        <h4>Critical infrastructure is being rebuilt during ongoing operations.<\/h4>\n        <p>Maintenance, supply security, and existing facilities limit construction times, shutdowns, and resource deployment. Many projects access the same technical time windows and operational units. <\/p>\n        <div class=\"driver-q\"><span>The question behind it:<\/span> Where do expansion projects conflict with the demands of ongoing operations?<\/div>      <\/div>\n    <\/article>\n      <\/div>\n  <\/div><\/section><\/div>\n<div class=\"lbx lbx-branch-insights\"><section class=\"section branch-insights\" id=\"planungsrealitaet\"><div class=\"wrap\">\n  <div class=\"sec-head left reveal\"><span class=\"eyebrow\">Planning Reality in Energy &amp; Utilities<\/span><h2>What integrated planning in energy &amp; utilities must master.<\/h2><p>Investment portfolios, approvals, CAPEX, bottleneck resources, and ongoing operations intertwine over long infrastructure cycles. Five areas of tension particularly shape planning. <\/p><\/div>\n  <div class=\"branch-insights-list reveal\" id=\"branch-insights-1\" data-branch-accordion>\n        <article class=\"branch-insight\">\n      <button class=\"branch-insight-trigger\" id=\"branch-insights-1-button-1\" type=\"button\" aria-expanded=\"false\" aria-controls=\"branch-insights-1-panel-1\">\n        <span class=\"branch-insight-no\">01<\/span>\n        <span class=\"branch-insight-summary\"><strong>Not every investment can be freely prioritized<\/strong><span>How are regulatory, operational, and strategic investments prioritized together?<\/span><\/span>\n        <span class=\"branch-insight-plus\" aria-hidden=\"true\"><\/span>\n      <\/button>\n      <div class=\"branch-insight-panel\" id=\"branch-insights-1-panel-1\" role=\"region\" aria-labelledby=\"branch-insights-1-button-1\">\n        <div class=\"branch-insight-panel-inner\">\n          <p>In an energy portfolio, regulatory requirements, replacement investments, grid connections, and maintenance stand alongside growth and transformation projects. These projects fundamentally differ in urgency, risk contribution, and economic logic.<\/p><p>New regulations or a changed grid status can shift the sequence at short notice. At the same time, budget and implementation capacity remain limited. A mere ranking by business case falls short in this constellation.<\/p>        <\/div>\n      <\/div>\n    <\/article>\n        <article class=\"branch-insight\">\n      <button class=\"branch-insight-trigger\" id=\"branch-insights-1-button-2\" type=\"button\" aria-expanded=\"false\" aria-controls=\"branch-insights-1-panel-2\">\n        <span class=\"branch-insight-no\">02<\/span>\n        <span class=\"branch-insight-summary\"><strong>Project deadlines largely originate outside the project<\/strong><span>How can the overall schedule remain reliable when approvals, land rights, or administrative procedures dictate the pace?<\/span><\/span>\n        <span class=\"branch-insight-plus\" aria-hidden=\"true\"><\/span>\n      <\/button>\n      <div class=\"branch-insight-panel\" id=\"branch-insights-1-panel-2\" role=\"region\" aria-labelledby=\"branch-insights-1-button-2\">\n        <div class=\"branch-insight-panel-inner\">\n          <p>Approvals, land rights, grid connections, administrative procedures, and external expert opinions determine significant parts of the timeline for many infrastructure projects. Their progress can only be accelerated to a limited extent by additional internal resources.<\/p><p>Technical work packages may be prepared while an external decision point blocks the next step. Delays then impact procurement, construction, commissioning, and already reserved capacities.<\/p>        <\/div>\n      <\/div>\n    <\/article>\n        <article class=\"branch-insight\">\n      <button class=\"branch-insight-trigger\" id=\"branch-insights-1-button-3\" type=\"button\" aria-expanded=\"false\" aria-controls=\"branch-insights-1-panel-3\">\n        <span class=\"branch-insight-no\">03<\/span>\n        <span class=\"branch-insight-summary\"><strong>Long-term CAPEX planning meets volatile project costs<\/strong><span>How do cost estimates, approved budgets, forecasts, and cash outflows remain consistent over long durations?<\/span><\/span>\n        <span class=\"branch-insight-plus\" aria-hidden=\"true\"><\/span>\n      <\/button>\n      <div class=\"branch-insight-panel\" id=\"branch-insights-1-panel-3\" role=\"region\" aria-labelledby=\"branch-insights-1-button-3\">\n        <div class=\"branch-insight-panel-inner\">\n          <p>Large infrastructure programs are planned over years. Tenders, material prices, financing costs, delivery times, and scope can change significantly during this period.<\/p><p>The transition from strategic investment planning to project execution is particularly sensitive. Early cost estimates, approved budgets, forecasts, and actual cash outflows must remain traceable across multiple planning stages.<\/p>        <\/div>\n      <\/div>\n    <\/article>\n        <article class=\"branch-insight\">\n      <button class=\"branch-insight-trigger\" id=\"branch-insights-1-button-4\" type=\"button\" aria-expanded=\"false\" aria-controls=\"branch-insights-1-panel-4\">\n        <span class=\"branch-insight-no\">04<\/span>\n        <span class=\"branch-insight-summary\"><strong>Bottlenecks concentrate on a few roles and supply chains<\/strong><span>How can it be made visible which roles, partners, or components limit the actually implementable project volume?<\/span><\/span>\n        <span class=\"branch-insight-plus\" aria-hidden=\"true\"><\/span>\n      <\/button>\n      <div class=\"branch-insight-panel\" id=\"branch-insights-1-panel-4\" role=\"region\" aria-labelledby=\"branch-insights-1-button-4\">\n        <div class=\"branch-insight-panel-inner\">\n          <p>Engineering, grid planning, approval management, construction supervision, and specialized external partners are needed by many projects in parallel. It is not the total number of available employees that limits the portfolio, but individual qualifications at specific times.<\/p><p>Framework agreement partners, construction capacities, or critical components also act like resources: if they are exhausted, additional projects cannot easily be parallelized despite available budgets.<\/p>        <\/div>\n      <\/div>\n    <\/article>\n        <article class=\"branch-insight\">\n      <button class=\"branch-insight-trigger\" id=\"branch-insights-1-button-5\" type=\"button\" aria-expanded=\"false\" aria-controls=\"branch-insights-1-panel-5\">\n        <span class=\"branch-insight-no\">05<\/span>\n        <span class=\"branch-insight-summary\"><strong>Project and operations access the same infrastructure<\/strong><span>How are expansion projects synchronized with shutdowns, maintenance, and the demands of ongoing operations?<\/span><\/span>\n        <span class=\"branch-insight-plus\" aria-hidden=\"true\"><\/span>\n      <\/button>\n      <div class=\"branch-insight-panel\" id=\"branch-insights-1-panel-5\" role=\"region\" aria-labelledby=\"branch-insights-1-button-5\">\n        <div class=\"branch-insight-panel-inner\">\n          <p>Conversions, expansions, and maintenance require shutdowns, access, and technical time windows on facilities that are also needed for ongoing operations. Several projects may therefore be schedulable individually but not together.<\/p><p>This conflict becomes particularly visible during planned downtimes, switchovers, and commissioning. There, project planning and operational planning directly intertwine.<\/p>        <\/div>\n      <\/div>\n    <\/article>\n      <\/div>\n<\/div><\/section><\/div>\n<div class=\"lbx lbx-branch-answer\">\n  <section class=\"section branch-answer\" id=\"beitrag\">\n    <div class=\"wrap\">\n      <div class=\"branch-answer-copy sec-head left reveal\">\n        <span class=\"eyebrow\">Our Approach<\/span>\n        <h2>We reduce complexity through integrated planning solutions.<\/h2>\n        <p>We combine an understanding of investment, infrastructure, and transformation programs with proven control models and comprehensive technological expertise. This allows portfolio decisions, project progress, capacities, and investment planning to be mapped within a common control logic.<\/p>              <\/div>\n    <\/div>\n\n    <div class=\"branch-answer-clamp reveal\">\n      <div class=\"wrap branch-answer-clamp-inner\">\n                  <p class=\"branch-answer-principle\">As standard as possible. As individual as necessary.<\/p>\n        \n        <div class=\"branch-answer-tech-inline\">\n          <p class=\"branch-answer-tech-intro\">For implementation, we rely on established PPM platforms \u2013 tailored to your individual challenge.<\/p>\n                      <div class=\"branch-answer-platforms-inline\" aria-label=\"Technologieplattformen\">\n                              <a class=\"branch-answer-platform-inline\" href=\"https:\/\/www.lebihan.de\/en\/planisware-enterprise\/\">                                      <span class=\"branch-answer-platform-inline-logo\">\n                      <img decoding=\"async\" src=\"\/wp-content\/themes\/lebihan\/assets\/img\/img-42-8203ad1f2f.png\" alt=\"Planisware Enterprise\" loading=\"lazy\">                    <\/span>\n                                    <span class=\"branch-answer-platform-inline-title\">Planisware Enterprise<\/span>                  <span class=\"branch-answer-platform-inline-arrow\" aria-hidden=\"true\">\u2192<\/span>                <\/a>                              <a class=\"branch-answer-platform-inline\" href=\"https:\/\/www.lebihan.de\/en\/partner-cplace\/\">                                      <span class=\"branch-answer-platform-inline-logo\">\n                      <img decoding=\"async\" src=\"\/wp-content\/themes\/lebihan\/assets\/img\/img-41-97f75f2804.png\" alt=\"cplace\" loading=\"lazy\">                    <\/span>\n                                    <span class=\"branch-answer-platform-inline-title\">cplace<\/span>                  <span class=\"branch-answer-platform-inline-arrow\" aria-hidden=\"true\">\u2192<\/span>                <\/a>                          <\/div>\n                  <\/div>\n      <\/div>\n    <\/div>\n  <\/section>\n<\/div>\n<div class=\"lbx\">\n  <section class=\"section branch-references is-compact is-compact-visual\" id=\"referenzen\">\n    <div class=\"wrap\">\n      <div class=\"sec-head left reveal\">\n        <span class=\"eyebrow\">References<\/span>\n        <h2>Years of experience in Energy &amp; Utilities.<\/h2>              <\/div>\n\n              <div class=\"ref-compact-grid\">\n          <div class=\"ref-compact-trust\">\n            <p class=\"cband-label reveal\">Selected References<\/p>            <div class=\"ref-compact-logos reveal\">\n                              <div class=\"ref-compact-logo\"><img width=\"156\" height=\"52\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/alperia-1.png\" class=\"attachment-full size-full\" alt=\"Alperia\" loading=\"lazy\" decoding=\"async\" \/><\/div>\n                              <div class=\"ref-compact-logo\"><img width=\"226\" height=\"40\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/HamburgerEnergienetzeLogo.png\" class=\"attachment-full size-full\" alt=\"Hamburger Energienetze\" loading=\"lazy\" decoding=\"async\" \/><\/div>\n                              <div class=\"ref-compact-logo\"><img width=\"1928\" height=\"550\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/juwi-logo-1.png\" class=\"attachment-full size-full\" alt=\"juwi\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/juwi-logo-1.png 1928w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/juwi-logo-1-300x86.png 300w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/juwi-logo-1-1024x292.png 1024w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/juwi-logo-1-768x219.png 768w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/juwi-logo-1-1536x438.png 1536w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/juwi-logo-1-350x100.png 350w\" sizes=\"auto, (max-width: 1928px) 100vw, 1928px\" \/><\/div>\n                              <div class=\"ref-compact-logo\"><img width=\"3840\" height=\"1114\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/RWE_Logo_2020.svg_.webp\" class=\"attachment-full size-full\" alt=\"RWE\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/RWE_Logo_2020.svg_.webp 3840w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/RWE_Logo_2020.svg_-300x87.webp 300w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/RWE_Logo_2020.svg_-1024x297.webp 1024w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/RWE_Logo_2020.svg_-768x223.webp 768w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/RWE_Logo_2020.svg_-1536x446.webp 1536w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/RWE_Logo_2020.svg_-2048x594.webp 2048w\" sizes=\"auto, (max-width: 3840px) 100vw, 3840px\" \/><\/div>\n                              <div class=\"ref-compact-logo\"><img width=\"202\" height=\"138\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/UKA-1.png\" class=\"attachment-full size-full\" alt=\"UKA\" loading=\"lazy\" decoding=\"async\" \/><\/div>\n                              <div class=\"ref-compact-logo\"><img width=\"561\" height=\"374\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/uniper-1.png\" class=\"attachment-full size-full\" alt=\"Uniper\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/uniper-1.png 561w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/uniper-1-300x200.png 300w\" sizes=\"auto, (max-width: 561px) 100vw, 561px\" \/><\/div>\n                          <\/div>          <\/div>\n                      <div class=\"ref-feature-wrap reveal\">\n              <a class=\"ref-feature-case ref-feature-case--standard\" href=\"https:\/\/www.lebihan.de\/success-stories\/der-energieparkentwickler-uka-stellt-sein-projektmanagement-neu-auf-success-story-uka\/\">\n                <div class=\"ref-feature-media\">\n                  <img src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/Vorschaubild_Success-Stories_UKA_Webseite-e1789048343747.jpg\" alt=\"Project management for growing energy park portfolios re-established.\" loading=\"lazy\" decoding=\"async\">\n                                  <\/div>\n                <div class=\"ref-feature-caption\">\n                  <span class=\"ss-kick\">Success Story<\/span>\n                  <h3>Project management for growing energy park portfolios re-established.<\/h3>\n                  <span class=\"ref-feature-link\">Read more <svg class=\"ic\" viewBox=\"0 0 24 24\" aria-hidden=\"true\"><path d=\"M5 12h14M13 6l6 6-6 6\"\/><\/svg><\/span>\n                <\/div>\n              <\/a>\n            <\/div>\n                  <\/div>\n        \n      \n      \n          <\/div>\n  <\/section>\n<\/div>\n    <div class=\"lbcx\"><section class=\"lbcx-person\" id=\"kontakt\"><div class=\"wrap\">\n      <div class=\"lbcx-person-card reveal\">\n        <div class=\"lbcx-person-media\">\n                      <img width=\"768\" height=\"672\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/06_Bjoern_Tropf_Director_Solution_Engineering-768x672.jpg\" class=\"lbcx-person-photo\" alt=\"Bj\u00f6rn Tropf\" loading=\"lazy\" decoding=\"async\" fetchpriority=\"low\" sizes=\"auto, (max-width: 800px) 150px, 190px\" \/>                  <\/div>\n        <div class=\"lbcx-person-copy\">\n          <span class=\"eyebrow steel\">Your Contact for Energy &amp; Utilities<\/span>\n          <h2>Bj\u00f6rn Tropf<\/h2>\n          <p class=\"lbcx-person-role\">Director of Solutions<\/p>          <blockquote>\u201eNew technologies alone do not accelerate the energy transition. What matters is which projects can be implemented when with the available investments and capacities, while existing systems must continue to operate. This is precisely what we align our enterprise planning systems to.\u201c<\/blockquote>                      <div class=\"lbcx-person-contactline\">\n              <div class=\"lbcx-person-actions\">\n                <a class=\"lbcx-person-chip\" href=\"mailto:energy@lebihan.de\"><span aria-hidden=\"true\">\u2709<\/span><span>Email<\/span><\/a>                <a class=\"lbcx-person-chip\" href=\"tel:+496126959170\" aria-label=\"Phone: +49 6126 95917-0\" title=\"+49 6126 95917-0\"><span aria-hidden=\"true\">\u260e<\/span><span>Phone<\/span><\/a>                <a class=\"lbcx-person-chip lbcx-person-linkedin\" href=\"https:\/\/www.linkedin.com\/in\/bjorntropf\/\" target=\"_blank\" rel=\"noopener noreferrer\"><span class=\"lbcx-person-in\" aria-hidden=\"true\">in<\/span><span>LinkedIn \u2197<\/span><\/a>              <\/div>\n                          <\/div>\n                  <\/div>\n      <\/div>\n    <\/div><\/section><\/div>\n    ","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1516","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/pages\/1516","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/comments?post=1516"}],"version-history":[{"count":1,"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/pages\/1516\/revisions"}],"predecessor-version":[{"id":1523,"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/pages\/1516\/revisions\/1523"}],"wp:attachment":[{"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/media?parent=1516"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}