{"id":1353,"date":"2026-06-18T19:08:34","date_gmt":"2026-06-18T19:08:34","guid":{"rendered":"https:\/\/www.lebihan.de\/industry-ad\/"},"modified":"2026-10-20T10:20:13","modified_gmt":"2026-10-20T10:20:13","slug":"industry-ad","status":"publish","type":"page","link":"https:\/\/www.lebihan.de\/en\/industry-ad\/","title":{"rendered":"Industry &#8211; A&#038;D"},"content":{"rendered":"<div class=\"lbx\"><section class=\"hero bg-mode\">\n    <div class=\"hero-bg\"><img width=\"2560\" height=\"1706\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-josephmartin-5493554.jpg\" class=\"attachment-full size-full\" alt=\"Aerospace &amp; Defense\" loading=\"eager\" fetchpriority=\"high\" decoding=\"async\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-josephmartin-5493554.jpg 2560w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-josephmartin-5493554-300x200.jpg 300w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-josephmartin-5493554-1024x682.jpg 1024w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-josephmartin-5493554-768x512.jpg 768w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-josephmartin-5493554-1536x1024.jpg 1536w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/07\/pexels-josephmartin-5493554-2048x1365.jpg 2048w\" sizes=\"(max-width: 2560px) 100vw, 2560px\" \/><\/div>  <div class=\"wrap\">\n    <div class=\"hero-grid\">\n      <div class=\"hero-copy\">\n        <span class=\"eyebrow has-icon\"><svg class=\"ic\" viewBox=\"0 0 24 24\" aria-hidden=\"true\"><path d=\"M12 3l7 3v5c0 4.5-3 7.8-7 9-4-1.2-7-4.5-7-9V6z\"\/><\/svg>Aerospace &amp; Defense<\/span>\n        <h1>Manage long-running programs amidst increasing complexity.<\/h1>\n        <p class=\"lede\">Production rates are rising, defense programs are expanding, and new technologies must be brought to maturity faster. At the same time, certification, international supply chains, and long-term contract and cost structures remain decisive. <\/p>\n        <div class=\"hero-actions\">\n          <a class=\"btn btn-primary\" href=\"#kontakt\">Schedule an initial consultation \u2192<\/a>\n          <a class=\"branch-text-link\" href=\"#beitrag\">How we support you \u2192<\/a>        <\/div>\n      <\/div>\n          <\/div>\n  <\/div>\n<\/section><\/div>\n<div class=\"lbx\"><section class=\"section\" id=\"ausgangslage\"><div class=\"wrap\">\n  <div class=\"sec-head left reveal\"><span class=\"eyebrow\">The Initial Situation<\/span><h2>When increasing demand meets long-established program and supply structures.<\/h2><p>Civil aviation, defense, and space are growing in parallel. Production rates are being increased, existing programs expanded, and new technologies developed to operational or series maturity. However, many of the required competencies, supply chains, and production capacities can only be built up over years. Even with increased pace, technical verification, certification, cost control, and contractually defined deliverables remain binding. Program management must therefore handle increasing dynamism without losing traceability of schedule, costs, and technical maturity.    <\/p><\/div>\n  <aside class=\"branch-context-note reveal\"><span>Industry Situation \u00b7 2026<\/span><p>The German aerospace industry achieved a record turnover of 62 billion Euros in 2025, 19% more than the previous year. Civil aviation grew by 15%, military aviation by 35%, and space by 17%. <a href=\"https:\/\/www.bdli.de\/meldungen\/bdli-branchendaten-2026-luft-und-raumfahrtindustrie-erreicht-neue-rekorde-bei-umsatz-und\" target=\"_blank\" rel=\"noopener noreferrer\">BDLI \u00b7 Industry Data 2026 \u2197<\/a><\/p><\/aside>  <div class=\"drivers-label reveal\">What drives the industry<\/div>\n  <div class=\"drivers\">\n        <article class=\"driver-card reveal\">\n              <div class=\"driver-img\"><img decoding=\"async\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/pexels-michel-rothstein-1240723-9279438.jpg\" alt=\"Demand becomes a capacity issue.\" loading=\"lazy\"><\/div>\n            <div class=\"driver-body\">\n        <span class=\"driver-kicker\">Production Ramp-up<\/span>\n        <h4>Demand becomes a capacity issue.<\/h4>\n        <p>High order backlogs demand increasing production rates. Suppliers, manufacturing, engineering, and quality must collectively support this ramp-up. Individual components or specialized production steps can limit the overall system.  <\/p>\n        <div class=\"driver-q\"><span>The question behind it:<\/span> What production rates are actually achievable with existing supply chains, facilities, and specialists?<\/div>      <\/div>\n    <\/article>\n        <article class=\"driver-card reveal\">\n              <div class=\"driver-img\"><img decoding=\"async\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/pexels-osman-17854252.jpg\" alt=\"New technologies undergo long journeys to operational maturity.\" loading=\"lazy\"><\/div>\n            <div class=\"driver-body\">\n        <span class=\"driver-kicker\">Technology &amp; Certification<\/span>\n        <h4>New technologies undergo long journeys to operational maturity.<\/h4>\n        <p>New propulsion systems, materials, avionics, and software must build technical maturity, system integration, and regulatory verification over many years. Changes can affect already achieved verification statuses again. <\/p>\n        <div class=\"driver-q\"><span>The question behind it:<\/span> How do technology development, product program, and certification remain consistent over long durations?<\/div>      <\/div>\n    <\/article>\n        <article class=\"driver-card reveal\">\n              <div class=\"driver-img\"><img decoding=\"async\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/pexels-spacex-586056.jpg\" alt=\"New priorities change the scope and speed of existing programs.\" loading=\"lazy\"><\/div>\n            <div class=\"driver-body\">\n        <span class=\"driver-kicker\">Defense &amp; Space<\/span>\n        <h4>New priorities change the scope and speed of existing programs.<\/h4>\n        <p>Defense and space programs are being expanded, new programs are being added, and political priorities are changing faster. However, contract structures, security requirements, and international partner networks remain complex. <\/p>\n        <div class=\"driver-q\"><span>The question behind it:<\/span> What impact do acceleration and new requirements have on existing baselines, capacities, and delivery obligations?<\/div>      <\/div>\n    <\/article>\n      <\/div>\n  <\/div><\/section><\/div>\n<div class=\"lbx lbx-branch-insights\"><section class=\"section branch-insights\" id=\"planungsrealitaet\"><div class=\"wrap\">\n  <div class=\"sec-head left reveal\"><span class=\"eyebrow\">Planning Reality in Aerospace &amp; Defense<\/span><h2>What integrated planning in Aerospace &amp; Defense must master.<\/h2><p>Baselines, technical maturity, costs, international supply chains, and scarce specialized resources intertwine over long program durations. Five areas of tension particularly shape planning. <\/p><\/div>\n  <div class=\"branch-insights-list reveal\" id=\"branch-insights-1\" data-branch-accordion>\n        <article class=\"branch-insight\">\n      <button class=\"branch-insight-trigger\" id=\"branch-insights-1-button-1\" type=\"button\" aria-expanded=\"false\" aria-controls=\"branch-insights-1-panel-1\">\n        <span class=\"branch-insight-no\">01<\/span>\n        <span class=\"branch-insight-summary\"><strong>Baseline and current program status diverge over time<\/strong><span>How can approved baselines, current forecasts, and new scenarios remain distinguishable over long program durations?<\/span><\/span>\n        <span class=\"branch-insight-plus\" aria-hidden=\"true\"><\/span>\n      <\/button>\n      <div class=\"branch-insight-panel\" id=\"branch-insights-1-panel-1\" role=\"region\" aria-labelledby=\"branch-insights-1-button-1\">\n        <div class=\"branch-insight-panel-inner\">\n          <p>Large programs can run for decades. Requirements, technical assumptions, scope of delivery, and political frameworks change multiple times within this period. Nevertheless, the approved baseline remains the reference for schedule, budget, and contractual obligations.<\/p><p>With every major change, the number of relevant planning statuses grows. Without a clear separation of baseline, current forecast, and possible scenarios, the reported program status loses its informative value.<\/p>        <\/div>\n      <\/div>\n    <\/article>\n        <article class=\"branch-insight\">\n      <button class=\"branch-insight-trigger\" id=\"branch-insights-1-button-2\" type=\"button\" aria-expanded=\"false\" aria-controls=\"branch-insights-1-panel-2\">\n        <span class=\"branch-insight-no\">02<\/span>\n        <span class=\"branch-insight-summary\"><strong>Technical progress cannot be read from the schedule<\/strong><span>How does technical maturity become visible when schedule progress alone does not provide a reliable statement?<\/span><\/span>\n        <span class=\"branch-insight-plus\" aria-hidden=\"true\"><\/span>\n      <\/button>\n      <div class=\"branch-insight-panel\" id=\"branch-insights-1-panel-2\" role=\"region\" aria-labelledby=\"branch-insights-1-button-2\">\n        <div class=\"branch-insight-panel-inner\">\n          <p>A work package can be completed on schedule without the technology or system having reached the intended maturity level. TRL, verification, validation, and certification evidence do not necessarily develop at the same pace as the project plan.<\/p><p>A postponed test or missing verification can block further integration and certification activities, even if the formal development plan is already far advanced.<\/p>        <\/div>\n      <\/div>\n    <\/article>\n        <article class=\"branch-insight\">\n      <button class=\"branch-insight-trigger\" id=\"branch-insights-1-button-3\" type=\"button\" aria-expanded=\"false\" aria-controls=\"branch-insights-1-panel-3\">\n        <span class=\"branch-insight-no\">03<\/span>\n        <span class=\"branch-insight-summary\"><strong>Schedule, costs, and performance are managed from different structures<\/strong><span>How are schedule, costs, and actual performance brought to the same program status?<\/span><\/span>\n        <span class=\"branch-insight-plus\" aria-hidden=\"true\"><\/span>\n      <\/button>\n      <div class=\"branch-insight-panel\" id=\"branch-insights-1-panel-3\" role=\"region\" aria-labelledby=\"branch-insights-1-button-3\">\n        <div class=\"branch-insight-panel-inner\">\n          <p>Master Schedule, WBS, cost structure, contracts, and organizational responsibilities depict the same program from different perspectives. Even small inconsistencies at the work package level can generate significant deviations during consolidation.<\/p><p>Earned Value intensifies this demand. Reported progress, actual performance, costs, and forecast must reflect the same program status at the same reporting time.<\/p>        <\/div>\n      <\/div>\n    <\/article>\n        <article class=\"branch-insight\">\n      <button class=\"branch-insight-trigger\" id=\"branch-insights-1-button-4\" type=\"button\" aria-expanded=\"false\" aria-controls=\"branch-insights-1-panel-4\">\n        <span class=\"branch-insight-no\">04<\/span>\n        <span class=\"branch-insight-summary\"><strong>The critical path runs through an international supply network<\/strong><span>How can critical dependencies in international supply networks be identified early enough?<\/span><\/span>\n        <span class=\"branch-insight-plus\" aria-hidden=\"true\"><\/span>\n      <\/button>\n      <div class=\"branch-insight-panel\" id=\"branch-insights-1-panel-4\" role=\"region\" aria-labelledby=\"branch-insights-1-button-4\">\n        <div class=\"branch-insight-panel-inner\">\n          <p>System integrators, Tier 1 and Tier 2 suppliers, development partners, and authorities each deliver parts of a common program. Some components have long lead times or come from a few specialized providers.<\/p><p>A delayed component can successively postpone integration, test campaigns, certification, and production ramp-up. Dependencies for which neither technical alternatives nor additional capacities are available in the short term are particularly critical.<\/p>        <\/div>\n      <\/div>\n    <\/article>\n        <article class=\"branch-insight\">\n      <button class=\"branch-insight-trigger\" id=\"branch-insights-1-button-5\" type=\"button\" aria-expanded=\"false\" aria-controls=\"branch-insights-1-panel-5\">\n        <span class=\"branch-insight-no\">05<\/span>\n        <span class=\"branch-insight-summary\"><strong>Specialists and test resources are over-planned for years across multiple projects<\/strong><span>How are specialists, test facilities, and certification capacities planned across multiple programs?<\/span><\/span>\n        <span class=\"branch-insight-plus\" aria-hidden=\"true\"><\/span>\n      <\/button>\n      <div class=\"branch-insight-panel\" id=\"branch-insights-1-panel-5\" role=\"region\" aria-labelledby=\"branch-insights-1-button-5\">\n        <div class=\"branch-insight-panel-inner\">\n          <p>Programs rely on highly specialized engineering roles, test facilities, test vehicles, and certification expertise. Many of these resources are needed by multiple programs and can hardly be expanded at short notice.<\/p><p>If a test is postponed by a few months, it can fall exactly into the reserved time slot of another program. A local schedule deviation thus creates a resource conflict across the entire portfolio.<\/p>        <\/div>\n      <\/div>\n    <\/article>\n      <\/div>\n<\/div><\/section><\/div>\n<div class=\"lbx lbx-branch-answer\">\n  <section class=\"section branch-answer\" id=\"beitrag\">\n    <div class=\"wrap\">\n      <div class=\"branch-answer-copy sec-head left reveal\">\n        <span class=\"eyebrow\">Our Approach<\/span>\n        <h2>We reduce complexity through integrated planning solutions.<\/h2>\n        <p>We combine an understanding of long-term development and contract programs with proven control mechanisms and comprehensive technological expertise. This allows schedules, costs, technical maturity, resources, and decision statuses to be managed consistently, even across complex program structures.<\/p>              <\/div>\n    <\/div>\n\n    <div class=\"branch-answer-clamp reveal\">\n      <div class=\"wrap branch-answer-clamp-inner\">\n                  <p class=\"branch-answer-principle\">As close to standard as possible. As individual as necessary.<\/p>\n        \n        <div class=\"branch-answer-tech-inline\">\n          <p class=\"branch-answer-tech-intro\">For implementation, we rely on established PPM platforms \u2013 tailored to your individual challenge.<\/p>\n                      <div class=\"branch-answer-platforms-inline\" aria-label=\"Technologieplattformen\">\n                              <a class=\"branch-answer-platform-inline\" href=\"https:\/\/www.lebihan.de\/en\/planisware-enterprise\/\">                                      <span class=\"branch-answer-platform-inline-logo\">\n                      <img decoding=\"async\" src=\"\/wp-content\/themes\/lebihan\/assets\/img\/img-42-8203ad1f2f.png\" alt=\"Planisware Enterprise\" loading=\"lazy\">                    <\/span>\n                                    <span class=\"branch-answer-platform-inline-title\">Planisware Enterprise<\/span>                  <span class=\"branch-answer-platform-inline-arrow\" aria-hidden=\"true\">\u2192<\/span>                <\/a>                              <a class=\"branch-answer-platform-inline\" href=\"https:\/\/www.lebihan.de\/en\/partner-cplace\/\">                                      <span class=\"branch-answer-platform-inline-logo\">\n                      <img decoding=\"async\" src=\"\/wp-content\/themes\/lebihan\/assets\/img\/img-41-97f75f2804.png\" alt=\"cplace\" loading=\"lazy\">                    <\/span>\n                                    <span class=\"branch-answer-platform-inline-title\">cplace<\/span>                  <span class=\"branch-answer-platform-inline-arrow\" aria-hidden=\"true\">\u2192<\/span>                <\/a>                          <\/div>\n                  <\/div>\n      <\/div>\n    <\/div>\n  <\/section>\n<\/div>\n<div class=\"lbx\">\n  <section class=\"section branch-references is-compact is-compact-visual\" id=\"referenzen\">\n    <div class=\"wrap\">\n      <div class=\"sec-head left reveal\">\n        <span class=\"eyebrow\">References<\/span>\n        <h2>Years of experience in Aerospace &amp; Defense.<\/h2>              <\/div>\n\n              <div class=\"ref-compact-grid\">\n          <div class=\"ref-compact-trust\">\n            <p class=\"cband-label reveal\">Selected References<\/p>            <div class=\"ref-compact-logos reveal\">\n                              <div class=\"ref-compact-logo\"><img width=\"200\" height=\"100\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/ks_huayu_alutechgmbh_logo-e1789402192559.jpg\" class=\"attachment-full size-full\" alt=\"\" loading=\"lazy\" decoding=\"async\" \/><\/div>\n                              <div class=\"ref-compact-logo\"><img width=\"2560\" height=\"696\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/KS-LBP.png\" class=\"attachment-full size-full\" alt=\"\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/KS-LBP.png 2560w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/KS-LBP-300x82.png 300w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/KS-LBP-1024x278.png 1024w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/KS-LBP-768x209.png 768w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/KS-LBP-1536x418.png 1536w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/KS-LBP-2048x557.png 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/div>\n                              <div class=\"ref-compact-logo\"><img width=\"1236\" height=\"567\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/mtu_logo_dark-1.png\" class=\"attachment-full size-full\" alt=\"MTU Aero Engines\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/mtu_logo_dark-1.png 1236w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/mtu_logo_dark-1-300x138.png 300w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/mtu_logo_dark-1-1024x470.png 1024w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/mtu_logo_dark-1-768x352.png 768w\" sizes=\"auto, (max-width: 1236px) 100vw, 1236px\" \/><\/div>\n                              <div class=\"ref-compact-logo\"><img width=\"3840\" height=\"1047\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/Rheinmetall_Logo_2021.svg_.webp\" class=\"attachment-full size-full\" alt=\"\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/Rheinmetall_Logo_2021.svg_.webp 3840w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/Rheinmetall_Logo_2021.svg_-300x82.webp 300w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/Rheinmetall_Logo_2021.svg_-1024x279.webp 1024w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/Rheinmetall_Logo_2021.svg_-768x209.webp 768w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/Rheinmetall_Logo_2021.svg_-1536x419.webp 1536w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/Rheinmetall_Logo_2021.svg_-2048x558.webp 2048w\" sizes=\"auto, (max-width: 3840px) 100vw, 3840px\" \/><\/div>\n                              <div class=\"ref-compact-logo\"><img width=\"320\" height=\"320\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/idQLTskRQw_1789114206812.png\" class=\"attachment-full size-full\" alt=\"Rohde &amp; Schwarz\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/idQLTskRQw_1789114206812.png 320w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/idQLTskRQw_1789114206812-300x300.png 300w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/09\/idQLTskRQw_1789114206812-150x150.png 150w\" sizes=\"auto, (max-width: 320px) 100vw, 320px\" \/><\/div>\n                              <div class=\"ref-compact-logo\"><img width=\"2560\" height=\"323\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/Qioptiq-teledyne-logo.png\" class=\"attachment-full size-full\" alt=\"Teledyne\" loading=\"lazy\" decoding=\"async\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/Qioptiq-teledyne-logo.png 2560w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/Qioptiq-teledyne-logo-300x38.png 300w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/Qioptiq-teledyne-logo-1024x129.png 1024w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/Qioptiq-teledyne-logo-768x97.png 768w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/Qioptiq-teledyne-logo-1536x194.png 1536w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/Qioptiq-teledyne-logo-2048x258.png 2048w\" sizes=\"auto, (max-width: 2560px) 100vw, 2560px\" \/><\/div>\n                          <\/div>          <\/div>\n                      <div class=\"ref-feature-wrap reveal\">\n              <a class=\"ref-feature-case ref-feature-case--standard\" href=\"\/success-stories\/\">\n                <div class=\"ref-feature-media\">\n                  <img src=\"\/wp-content\/themes\/lebihan\/assets\/img\/branch-success-placeholder.svg\" alt=\"Project control in complex development programs.\" loading=\"lazy\" decoding=\"async\">\n                                  <\/div>\n                <div class=\"ref-feature-caption\">\n                  <span class=\"ss-kick\">Success Story<\/span>\n                  <h3>Project control in complex development programs.<\/h3>\n                  <span class=\"ref-feature-link\">Read more <svg class=\"ic\" viewBox=\"0 0 24 24\" aria-hidden=\"true\"><path d=\"M5 12h14M13 6l6 6-6 6\"\/><\/svg><\/span>\n                <\/div>\n              <\/a>\n            <\/div>\n                  <\/div>\n        \n      \n      \n          <\/div>\n  <\/section>\n<\/div>\n    <div class=\"lbcx\"><section class=\"lbcx-person\" id=\"kontakt\"><div class=\"wrap\">\n      <div class=\"lbcx-person-card reveal\">\n        <div class=\"lbcx-person-media\">\n                      <img width=\"768\" height=\"576\" src=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/HRE--768x576.jpg\" class=\"lbcx-person-photo\" alt=\"Hans Reinke\" loading=\"lazy\" decoding=\"async\" fetchpriority=\"low\" sizes=\"auto, (max-width: 800px) 150px, 190px\" srcset=\"https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/HRE--768x576.jpg 768w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/HRE--300x225.jpg 300w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/HRE--1024x768.jpg 1024w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/HRE--1536x1152.jpg 1536w, https:\/\/www.lebihan.de\/wp-content\/uploads\/2026\/08\/HRE-.jpg 1760w\" \/>                  <\/div>\n        <div class=\"lbcx-person-copy\">\n          <span class=\"eyebrow steel\">Your Contact for Aerospace &amp; Defense<\/span>\n          <h2>Hans Reinke<\/h2>\n          <p class=\"lbcx-person-role\">Team Lead<\/p>          <blockquote>\u201eFor complex programs, a clear picture of schedules, costs, technical maturity, and resources is essential. That&#039;s precisely why we build integrated planning systems that enable demanding programs to be successfully managed even under high pressure.\u201c<\/blockquote>                      <div class=\"lbcx-person-contactline\">\n              <div class=\"lbcx-person-actions\">\n                <a class=\"lbcx-person-chip\" href=\"mailto:aerospace@lebihan.de\"><span aria-hidden=\"true\">\u2709<\/span><span>Email<\/span><\/a>                <a class=\"lbcx-person-chip\" href=\"tel:+496126959170\" aria-label=\"Phone: +49 6126 95917-0\" title=\"+49 6126 95917-0\"><span aria-hidden=\"true\">\u260e<\/span><span>Phone<\/span><\/a>                <a class=\"lbcx-person-chip lbcx-person-linkedin\" href=\"https:\/\/www.linkedin.com\/in\/hans-reinke-le-bihan-consulting\/\" target=\"_blank\" rel=\"noopener noreferrer\"><span class=\"lbcx-person-in\" aria-hidden=\"true\">in<\/span><span>LinkedIn \u2197<\/span><\/a>              <\/div>\n                          <\/div>\n                  <\/div>\n      <\/div>\n    <\/div><\/section><\/div>\n    ","protected":false},"excerpt":{"rendered":"","protected":false},"author":1,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"_acf_changed":false,"footnotes":""},"class_list":["post-1353","page","type-page","status-publish","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/pages\/1353","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/comments?post=1353"}],"version-history":[{"count":1,"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/pages\/1353\/revisions"}],"predecessor-version":[{"id":1358,"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/pages\/1353\/revisions\/1358"}],"wp:attachment":[{"href":"https:\/\/www.lebihan.de\/en\/wp-json\/wp\/v2\/media?parent=1353"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}